Because of manufacturing issues, shipping and delivery delays occurred for a few J 35D subsystems, leading to the two initial J 35D sequence being shipped with only areas of the planned avionics set up. It had to be flown by just one pilot, nevertheless be effective at conducting beat operations https://kraken3511098.ivasdesign.com/57536028/everything-about-kra35-cc