Project Highlight At a prominent confectionery site in York, Newsome has installed a efficient 400 kW chiller, marking the timely conclusion of the project. Designed to advance ESG targets, the installation boosts system dependability while minimising overall power consumption and CO₂ levels. https://yesbookmarks.com/story20813649/energy-efficient-400-kw-chiller-installation-delivers-50-000-yearly-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-reduction